Shopping Cart
0 item(s) in cart
Ignou MBA Solved Assignments
Email or call us for IGNOU MBA Solved Assignments

MS-57 Solved Assignment

Rs. 400.00  Rs. 250.00
Save: 38% off

  • Version: 2018 July - Dec


Soft Copy: Yes
Downloadable File: Yes
University: IGNOU
Course: Master of Business Administration
File: PDF/ZIP Download

Q&A of Mba MS-57 Solved Assignment 2018 - Maintenance Management

Q. What is reliability centred maintenance? What are the important steps involved in implementing it in any plant?
Answer......

Q. Explain what is meant by cost absorption and cost apportionment? Illustrate each with two examples from maintenance department. Discuss the methods of cost absorption and state which method do you consider to be the best and why?
Answer.......

Q. Many organizations have standing conflicts amongst maintenance and production/operations employees. Describe the nature of these conflicts. What are the main causes?
Answer........

Q. What is meant by reliability and explain how it is different from quality? 'Availability is a more practical and appropriate measure of equipment performance'. Discuss.?
Answer......

Q. "Under RCM methodology, the problem is not failure at all, it is the consequences of failure". Discuss.
Answer......

Q. Write short notes on
a) Life Cycle Cost
b) Terotechnology
c) Condition Based Maintenance (CBM)
d) Spare Parts Inventory
Answer.......

Product Details: Mba MS-57 Solved Assignment 2018

Course: Ignou MBA (Master of Business Administration)
Session: July - Dec 2018
Subject: Maintenance Management

Old Sample Answers of Mba Ignou MS-57 Assignments

Q. What is Preventive or Planned Maintenance?
Answer. One area that too many companies ignore is the practice of preventive or planned equipment maintenance (PM), although there always seems to be no shortage of resources to fix something that has gone wrong. Think about our personal automobiles. How many of us studiously follow the manufacturer's schedule of preventive maintenance........ Preventive maintenance activities include partial or complete overhauls at specified periods, oil changes, lubrication and so on. In addition, workers can record equipment deterioration so they know to replace or repair worn parts before they cause system failure. The ideal preventive maintenance program would prevent all equipment failure before it occurs..........

Q. What is Total Productive Maintenance?
Answer. TPM is a maintenance strategy that focuses on process and people, and through deterioration prevention aspires to prevent any kind of slack before occurrence. The main objective of TPM is to achieve a reliable manufacturing system.......... This is accomplished by maximizing the overall equipment effectiveness so that plant and equipment productivity is increased.......... TPM is a comprehensive, resource-based maintenance management system that strongly focuses on improving equipment effectiveness, productivity and eliminating production losses. Total participation from all employees including top management and operators are vital in TPM..... All the eight TPM pillars put a strong emphasis on continuous process improvement through comprehensive and systematic maintenance management........ TPM puts emphasis on the elimination of equipment losses........ These equipment losses can be categorized into three main categories; namely downtime, speed losses and defects

To download the latest assignment make the payment. Old sample answers are not included in solution.


About Us    Privacy Policy    Shipping/Cancellation/Refund Policy    Terms and Conditions    Site map

Copyright © 2018 Universal Teacher Publications - IGNOU MBA Assignments, IGNOU MBA Solved Papers, Question Bank, Notes, Case Studies